E I CONSTRUCTION AND MANAGEMENT PRIVATE LIMITED

Few case studies on our Consulting Service

CASE STUDY 1
CLIENT:

F******Y

BENGALURU & NOIDA

4,00,000 Sq.Ft

SCOPE:

Installing Field Sensors

Building OS for FM

Employee Engagement

Carbon-Neutral Events

Micro-drop irrigation

Zero-waste Cooking

5 % 

Annual(YoY) Reductions In Energy & Water Usage & Waste Generation

HOW DID WE ACHIEVE:

  • We have first made a thorough facility evaluation to figure out the areas of improvements

  • Identified a few options of interventions that can bring immediate and tangible impact

  • Consulted various stakeholders, including vendor partners and employee representatives

  • The proposed interventions were then shortlisted based on Cost-Time-Impact implications

  • The final interventions were implemented in a phased manner – at 2 Interventions per quarter

  • The implementation process is closely monitored and reviewed for course correction, if need be

  • The final outcome is measured on a periodic timeline – 6 to 12 months – and reported

  • A honest feedback was sought and obtained from the user groups for their functional utility

  • A detailed case-study was prepared with objective outcomes and impact achieved 

CASE STUDY 2

CLIENT:

SA******CE

HYDERABAD

2,50,000 Sq.Ft

KEY INTERVENTIONS :

Integrating Field Devices

EV for Employee commute

Employee Incentives

Food waste reduction

8% 

Annual Energy Saving

20 % 

Reduction in Carbon Footprint

30 % 

Reduction in Waste Generation

HOW DID WE ACHIEVE:

  • We have first made a thorough facility operations evaluation to figure out the areas of improvements

  • Identified 4 options of interventions that can bring immediate and tangible impact

  • Consulted various stakeholders, including Global sustainability team, specific employee groups

  • The proposed interventions were then shortlisted based on Cost-Time-Impact implications presented

  • The final interventions were implemented over a period of 12 months

  • The implementation process is closely monitored and reviewed by the operations teams

  • The final outcome is measured at the end of the implementation and reported

  • A honest feedback was sought and obtained from the user groups for their functional utility

  • A detailed case-study was prepared with specific outcomes listed and published